We
begin 2003 with the house completely "dried in". The roof
is finished, the chimney is installed, plus all doors and windows
are installed.
Notice
the large picture windows facing west toward the Sangre de Cristos.
These windows provide an awesome view from almost any position on
the main floor and from the loft.
In
the coming weeks we will complete the plumbing, electrical, drywal,
and plaster. After that we will install the flooring. By that time,
warmer weather should take hold so that we can put the finishing
touches on the outside which will be a combination of stucco and
cultured stone. (Yes, our stones are all well versed in the arts
and sciences. We certainly would not want our stones to be uncultured,
would we?)
|